magic

Hi all,

I used to work for Metier, which was taken over by Lucas, while I was employed there.

We delivered the project management software, Artemis, for the Great Belt Link project, which consists of the East Bridge, a suspension bridge for road traffic (span 1624m/5328'), which would have been the largest span in the world for about 30 days, until the Akashi Kaikyō Bridge (span 1991m/6532') was completed, but they beat us to it, a bored tunnel for rail traffic, and the two forms of traffic meet in the middle of the belt on the island of Sprogø on a box girder bridge called the West bridge.



The tunnel, which was done by Monberg and Thorsen (MT Group) was originally planned in the Time Line project management system out of Novato, CA, however during the boring the tunnel was flooded, and the tunnel project was delayed by four years. I claim to this day that this was partly due to their switching to Artemis ;).

By the way, I started Magic Systems in 1991 with Time Line as my only product, and I find that it's still the best bl**dy project management system in the world.

The second great link project was the Öresund (Swedish) or Øresund (Danish) Bridge, and Magic Systems delivered more than 10 pcs. Time Line project management systems for that. This  is a double-track railway and dual carriageway bridge and tunnel across the Øresund sound/strait between Scania (southernmost Sweden) and Denmark. The bridge here is a cable-stayed bridge, and the tunnel is a tube tunnel consisting of prefabricated segments (55000t each) that were lowered into a trench in the seabed, connected and then pumped dry. Where the bridge and the tunnel meet, an artificial island was created, which is called Peberholm (pepper islet) to complement the natural island of Saltholm. The artificial island is now a designated nature reserve. This projec came in on budget and time.



Now Denmark is building the Fehmarn Belt Fixed Link between Lolland (Denmark) and Fehmarn (Germany), which will be an immersed tunnel, 17.6km/10.9 miles long, and even though I live only 10km from the project, they propably won't be using Time Line, as it doesn't work on 64 bit computers and Time Line Solutions went bust in 1996.
It's a kind of magic!




samdavo

Thanks magic,
very impressive photos - would look great in my scrapbook, but it would be false representations on my part, as I've never been involved with those sort of spans.
 
Obviously the drawings were all done with DCAD :)

prl

Quote from: samdavo on January 31, 2014, 06:30:14 PM
Obviously the drawings were all done with DCAD :)

Hi Sam, glad to see your post.  Thought maybe one of those spinning reference frame demonstrations got you.  :)

samdavo

howdy - prl , yep I've been distracted for a couple of months - Bit like you, during the couple of months before that  :)
In my case, I have been holidaying in Vancouver and San Fran.

Speaking of which, I note that there are issues with the new Oakland Bridge regarding welding carried out in Shanghai.  mmm.  Some modern trends are clearly not necessarily for the better - in the short term anyway.  I saw a post on a website - "No wonder Caltrans wanted to pull down the old bridge so quickly - how wmbarrassing it would have been if an earthquake hit, and the new one fell down, while the old one withstood it" :-[